Pyramid Contracting served as the Design-Build contractor for the 33,275-square-foot Hall 50 / LC1 Ramp Expansion at BMW Manufacturing’s Greer campus. The project expanded the existing facility by constructing a new connector between Hall 50 and LC1, featuring a production ramp designed to improve the movement of BMW Logistics’ production equipment while enhancing pedestrian circulation through new walkways and access points.
A key priority throughout construction was maintaining uninterrupted manufacturing operations. The project included phased demolition of the existing elevator system and associated building components, followed by construction of the new expansion, all while production remained active. Through detailed planning, phased execution, and close coordination with BMW, Pyramid completed the work while minimizing operational impacts and supporting the continued efficiency of one of the facility’s active manufacturing operations.